Updated Fees and Charges, 2022

On June 28, 2022, a Joint Ordinance amending the Schedule of Fees and Charges for the Columbia City/Whitley County Joint Planning and Building Department was adopted by the Columbia City Common Council and Whitley County Board of Commissioners. This ordinance establishes and amends the various building permit and planning filing fees charged by the Department. A copy of the full ordinance text may be found below. 

These fees will go into effect on October 5, 2022.

Permit Applications Fee Notes
Class 2 Buildings (One/two-family residential)
New construction/additions $120 + 8¢ per sf
Manufactured dwelling, outside of MHP $120 + 8¢ per sf
Remodeling $80 + 8¢ per sf
Decks, porches $80 + 8¢ per sf
Accessory structures, 201-2,000 sf $80 + 8¢ per sf
Accessory structures, 2,001+ sf $240 + 4¢ per sf over 2,000
Basement finish  $80 + 4¢ per sf Applies if building is completed over 1 year
Class 1 Buildings (Commercial, institutional, multi-family, etc.)
New construction/additions, up to 20,000 sf $120 + 8¢ per sf
New construction/additions, 20,001+ sf $1,720 + 4¢ per sf over 20,000
Remodeling/tenant finish, up to 20,000 sf $80 + 8¢ per sf
Remodeling/tenant finish, 20,001+ sf $1,680 + 4¢ per sf over 20,000
Swimming pools
Above-ground  $80 May include a deck up to 200 sf
In-ground $160
Commercial $160 + 8¢ per sf May include any required fencing
Hot tub (manufactured) $80
Hot tub (constructed) $160
Towers and utility structures
Communication tower, commercial $240
Communication tower, non-commercial $80
Antenna co-location, with ground building $120
Antenna co-location, electric service only $80
Commercial Wind Energy Conversion System tower $360
Non-commercial WECS tower $80
Ground-mounted solar, up to 20,000 sf panel area $80 + 1¢ per panel sf
Ground-mounted solar, 20,001+ sf panel area $280 + ¼¢ per panel sf over 20,000
Building-mounted solar arrays $80 + ½¢ per panel sf
Permits in established Mobile Home Parks
Manufactured home (doublewide) $120
Manufactured home (singlewide) $100
Decks, ramps, carports $40
Signs
On-building $40
Freestanding $80
Billboards $300
Other signs $40
Other construction permits
Accessibility ramp $60
Accessory structures, ≤ 200 sq ft $40
Demolition $15
Electric generator $80
Electric service and building rewire $120
Electric service upgrade $80
Fences $40
Fuel system, complete $120 + $40 per dispenser
Fuel system, partial $40 per dispenser
Gas reconnect (pressure test) $40
Gas system and appliance installation (new) $80
Parking lot (standalone) $80
Ponds $120 + $80/ac  Rounded to hundreths of an acre
Roof system $80
Zero-square foot remodel $80
Floodplain development (administrative) No fee
Floodplain development (inspections required) $80
Single inspections $50
Improvement Location Permit $40
Other construction types not listed As determined, based on number of inspections plus processing costs
Other fees
Amendment to an issued permit $50 + cost difference May be applied to new construction/remodel
Failed inspection/reinspection $80 May be applied if three failed inspections
Missed inspection $80
Permit issued after construction started 2x the base fee May be applied to new construction/remodel
Occupancy without Certificate of Occupancy issued $500
Permit fees are rounded to the nearest dollar
Planning/Zoning Applications  Fee Notes
Plan Commission filings
Zone map amendment (rezoning), up to 120 acres $360
Zone map amendment (rezoning), 120+ acres $360 + $2/acre over 120
Subdivision primary plat and replats, 1-4 lots $180
Subdivision primary plat and replats, 5+ lots $240 + $10/lot
Modifications to approved primary plats $180 + $10/lot
Subdivision technical review No fee
Subdivision secondary plat, administrative No fee
Subdivision secondary plat, if not administrative $180
Plat vacation $180
Modifications (e.g. covenants) $150
Comprehensive Plan amendments $600
Planned Unit Development, Primary PUD $500 + $2/acre
Planned Unit Development, Detailed PUD $360
Executive Committee filings
Development Plan $360
Development Plan, amendment to approved Plan $180
Development Plan, CBD setback review only $100
Board of Zoning Appeals filings
Development standards variance $240/$360 residential/commercial
Land use variance $360
Special exception $240
Special exception, fences or signs only $100
Appeals of administrative decisions $180
Documents 
Annual Report $5
Comprehensive Plan $20
Zoning Ordinance $20
Subdivision Ordinance $20 (City), $3 (others)
Copies, black & white 10¢ per page Letter/legal size
Copies, color 25¢ per page Letter/legal size
CDs/DVDs $5
Zoning certification letter $75
Other fees
Notice mailings, signs, advertisements, USBs, etc. Actual cost + 2%
Special PC meeting (initiated by petitioner) $480 Does not include filing fee
Special BZA meeting (initiated by petitioner) $300 Does not include filing fee
Planning/building services to other jurisdictions $6,000 Annual fee
Petition/document fees are rounded up to the nearest 5¢